The customer in Senegal found us through a friend's recommendation and inquired about the price of the dump truck. Through further communication with the customer, we understood that the customer wanted a dump truck with lifting capacity to transport warehouse goods. So we recommended the 10 Wheels SINOTRUK HOWO 380HP Dump Truck With Crane to the customer, the tipper truck with crane to meet the customer's use needs, the customer is very satisfied with our recommendation, soon the customer paid the deposit, the factory has begun production.

The SINOTRUK dump truck with crane adopts WEICHAI 380HP engine, and the engine is matched with a small ten-speed transmission, which is characterized by high power and high torque. The parking brake adopts broken air brake, which has a better guarantee in terms of braking power and braking reliability. The rear view mirror is equipped with wide-angle mirrors, floor mirrors and blindfolding mirrors, which is a good solution to most of the blind spots of driving and improves driving safety.

This dump truck with crane adopts shot blasting technology, which can increase the bonding force between the coating and the substrate, enhance its abrasion and corrosion resistance, and prolong the product life by shot blasting the workpiece before coating. And with the powder coating process, the molecular structure of the powder coating enables it to form chemical bonds with the metal surface, thus improving the adhesion of the coating. In contrast, conventional paints may flake or fade after multiple uses.

Safe operation of dump truck with crane: Before working, you must check whether each operating device is normal, whether the wire rope is in accordance with the safety regulations, whether the brake, hydraulic device and safety device are complete and sensitive and reliable. The lifting arm elevation angle shall not be less than 30 °, the crane should try to avoid lifting and lowering the lifting arm under load conditions. It is strictly prohibited to change the joystick before the lifting and lowering of the lifting arm is stabilized. When lifting heavy objects, the heavy objects should be lifted off the ground for about 10 centimeters, check the stability of the crane and the brake and other flexible and effective, in the case of confirming the normal situation before continuing to work.
